Numbers Needed to Treat

ARR (absolute risk reduction) = CER (control event rate) - EER (experimental event rate)

ARR = 9.6 - 2.8 = 6.8%

NNT = 1/ARR

NNT = 1/6.8 = 14.7 or 15%

back